Pendleton Place Apartments
1780 Pendleton St. Memphis, TN 38114
Client: Monroe Group
https://www.monroegroup.com/property/ pendleton-placel.
Budget Amount: $7 million renovation
Scope of work: Multifamily renovation
Renovated 149 low income units; providing all new finishes and updates. Complete demolition down to the studs and slab.
Providing new drywall, laminate floors, carpet in the bedrooms. New showers, toilets and sink. New cabinetry and appliances install. Reran wiring circuits, bringing units up to code as this multi unit complex hadn’t been updated since 1984.

Shelby County Health Center
814 Jefferson St. Memphis, TN 38105
Client: Turner Construction
https://www.turnerconstruction.com/
projects/memphis/shelby-county-health-department
Budget Amount: $1.1B Ground Up
Bid Amount Awarded: $1.1Million
Scope of work: Steel & Metal Framing
Demolished preexisting building.
Reconstructed building with Metal steel columns for sturdier structure. Ran aluminum metal framing throughout all 79,000 square feet of the property.

Chick-fil-A “The Pyramid”
3360 W 86Th St, Indianapolis, IN 46268
GC: Englewood Construction
Budget Amount: $1.9Million Group Up
Scope of work: Restaurant Build
Working thoroughly to develop and receive a C.O for the world renowned Chick-fil-A in a 21 week schedule. SteerWright managed the performance for Masonry, MEP’s, Finishes and install of the Ansul system, while introducing Procore Management software to a retro industry. In control of operations, Steer Wright managed to keep cost down and meet scheduled deadlines.

Moe’s Southwest Grill
2840 Atlanta Rd. Smyrna, GA 30080
GC: Englewood Construction
Budget Amount: $1.1 Million
Scope of Work: Restaurant Renovation
Transition a commercial property into a restaurant, adding a kitchen area with the proper ventilation that meets Georgia’s code regulations. Project required underground trenching to add plumbing for bathroom and kitchen, as well as built an additional 500 square feet on to the existing property to include a storage freezer area.

Bank of America HQ – Gateway Village
900 W Trade St. Charlotte, NC 28202
GC: McFarland Construction
Budget Amount: $1Million
Scope of Work: Office Renovation
Empty commercial property, developed into a financial office to house 40 banking employees. 30 cubicles, 5 separate offices, conference room, break room, 2 restrooms, training area, I.T room and copy machine area. Ran Data circuits from central area through floor, to power 40 different areas. Placed carpet, drop ceiling, grid and tile. Drywall, patted walls to secure sound, paint, plumbing for sinks and toilets.

Bruceton Farm Services: Fuel Station
434 E Main St. Hancock, MD 21750
GC: Cassnik Construction
Clients: Little Caesars, IHop, Burger King
Budget Amount: $7.1Million
Scope of Work: Fuel Station Ground Up
Responsible for the buildout of Burger King, Fuel Station, Little Caesars kiosk, and Hop. Pulling 3 separate permits.
Setting underground fuel tanks 60 feet below high traffic area. Installing freezers, underground plumbing for kitchens and restrooms, power. Setting piers, masonry, signage for buildings. Definitely a great experience.